| 1. | Research on technique check for existing bridge 加固混凝土结构抗弯承载力计算方法 |
| 2. | Modification of existing bridges , subways and box culverts 修建现有的桥梁,隧道与暗渠 |
| 3. | Existing bridge 2 of yuen long highway tuen mun - bound near 方向近兆康改建元朗公路现有 |
| 4. | C modification of existing bridges , subways and box culverts C修建现有的桥梁,隧道与暗渠 |
| 5. | Construction of bored pile at existing bridge 7 within nullah in progress 位于大沟渠旁边的桩柱工程 |
| 6. | Modification of existing bridge 6 位于?亨村路的桥台工程 |
| 7. | The reliability assessment of existing bridge based on neural network and response surface method 神经网络与响应面法相结合分析 |
| 8. | Prebored h pile at existing bridge 6 west abutment deck b completed and pile cap in progress 已完成位于福亨村路的地基工程及施工中的桩帽 |
| 9. | However , the service life of existing bridges has not been up to the design service life 桥梁结构的耐久性是影响桥梁安全与使用的重要因素。 |
| 10. | The road that is being constructed starts about 100 meters from an existing bridge across the china - nepal border 正在建设的这条公路从一座跨越中尼边境的现有桥梁大约100米的地方开始。 |